TBK Spillage Control project for producer of fertilizer

carm-V-1

Potassium and sulfate raw materials are transported from the ship unloading facility to the warehouses using conveyor belts. The transfer point from belt L1 to belt L2 was causing a lot of disruption due to spillage and dust.

TBK Group’s expertise in the field of both spillage and dust control was instrumental in obtaining the contract. A completely new transfer point, fitted with an expansion chamber and an integrated CARM-V integratable filter, was designed, assembled and put into operation.

TBK Spillage Control liberates a storage and transhipment company from spillage

spillage control overslagbedrijf

For a long time, fugitive matter was a thorn in the side of a large coal and iron ore processing storage and transhipment company. It caused wear and tear, contamination and maintenance-intensive working procedures at the loading point. By implementing an ImpTek impact bed, impact bars, Spill-Ex sealing blocks and ProTek ceramic skirt liners, TBK Spillage Control managed to bring the problem under control.